Tunbridge Wells

22-12-2025

Another new system installed, replacing a failed panel and devices in Tunbridge Wells.

This was a 3 floor unit of offices on an industrial estate just a couple of miles from the town centre. The new system is all wired, and controlled by an Advanced panel in the main entrance area.

If you look at our videos, you’ll see one of our engineers testing the very high entrance detector! Should the client make changes to the office layout the system can be easily upgraded with wireless infrastructure on existing cables which will enable the installation of wireless devices.


Return to Blog